Changes for page 13 Structure Mapping
Last modified by Helena on 2025/09/10 11:19
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -336,13 +336,11 @@ 336 336 337 337 [[image:SDMX 3-0-0 SECTION 6 FINAL-1.0_en_295af259.jpg||height="265" width="477"]] 338 338 339 -(% class="wikigeneratedid" id="HFigure24showingthecomponentmapmappingtheSOURCE_DATEDimensiontotheTIME_PERIODdimensionwiththeadditionalinformationonthecomponentmaptodescribethetimeformat" %) 340 -**Figure 24 showing the component map mapping the SOURCE_DATE Dimension to the TIME_PERIOD dimension with the additional information on the component map to describe the time format** 339 +==== Figure 24 showing the component map mapping the SOURCE_DATE Dimension to the TIME_PERIOD dimension with the additional information on the component map to describe the time format ==== 341 341 342 342 [[image:SDMX 3-0-0 SECTION 6 FINAL-1.0_en_a3215c79.jpg||height="265" width="480"]] 343 343 344 -(% class="wikigeneratedid" id="HFigure25showinganinputdateformat2CwhoseoutputfrequencyisderivedfromtheoutputvalueoftheFREQDimension" %) 345 -**Figure 25 showing an input date format, whose output frequency is derived from the output value of the FREQ Dimension** 343 +==== Figure 25 showing an input date format, whose output frequency is derived from the output value of the FREQ Dimension ==== 346 346 347 347 === 13.7.2 Numerical based datetime === 348 348 ... ... @@ -442,7 +442,7 @@ 442 442 Validity Period start period=2010 443 443 )))|(% style="width:328px" %)((( 444 444 Set 445 -OBS_CONF=F 443 +OBS_CONF=F** ** 446 446 ))) 447 447 448 448 In Rule 1, start period resolves to the start of the 2007 period (2007-01-01T00:00:00), and the end period resolves to the very end of 2009 (2009-12-31T23:59:59). The rule will hold true regardless of the input data frequency. Any observations reporting data for the Indicator XULADS that fall into that time range will have an OBS_CONF value of F. ... ... @@ -528,32 +528,40 @@ 528 528 |(% style="width:163px" %)18/07/1981|(% style="width:219px" %)dd/MM/yyyy|(% style="width:198px" %)A|(% style="width:180px" %)1981 529 529 ))) 530 530 531 -When the target frequency is based on another target Dimension value, in this example the value of the FREQ Dimension in the target DSD. 529 +When the target frequency is based on another target Dimension value, in this example __the value of the FREQ Dimension in the tar__get DSD. 532 532 531 + 533 533 ((( 534 -(% style="width:734.294px" %) 535 -|(% style="width:165px" %)**Source Value**|(% style="width:220px" %)**Source Mapping**|(% style="width:161px" %)**Target Frequency**|(% style="width:251px" %)**Output Dimension** 536 -|(% style="width:165px" %)18/07/1981|(% style="width:220px" %)dd/MM/yyyy|(% style="width:161px" %)FREQ|(% style="width:251px" %)1981-07-18 (when FREQ=D) 533 +|Source Value|Source Mapping|Target Frequency Output Dimension 537 537 538 -When the source is a numerical format 535 +|18/07/1981 dd/MM/yyyy|FREQ| |1981-07-18 (when FREQ=D) 536 +|(% rowspan="2" %)((( 537 +__When the source is a numerical form__at 539 539 540 -(% style="width:892.294px" %) 541 -|(% style="width:165px" %)**Source Value**|(% style="width:133px" %)**Start Period**|(% style="width:191px" %)**Interv**|(% style="width:264px" %)**Target FREQ**|(% style="width:167px" %)**Output** 542 -|(% style="width:165px" %)1589808220|(% style="width:133px" %)1970|(% style="width:191px" %)millisecond|(% style="width:264px" %)1981-07-18 (when FREQ=D)|(% style="width:167px" %)2020-05 539 +Source Value Start Period Interv 540 +)))| | | 541 +|al|((( 542 +Target 543 543 544 -When the source frequency is lower than the target frequency additional information 3485 can be provided for resolve to start of period, end of period, or mid period, as shown 3486 in the following example: 544 +FREQ 545 +)))|Output 546 +|(% colspan="2" %)1589808220 1970 millisecond|M|2020-05 545 545 ))) 546 546 547 -(% style="width:892.294px" %) 548 -|(% style="width:165px" %)**Source Value**|(% style="width:133px" %)**Source Mapping**|(% style="width:191px" %)**Target Dimension**|(% style="width:264px" %)**Frequency**|(% style="width:167px" %)**Output** 549 -|(% style="width:165px" %)1981|(% style="width:133px" %)yyyy|(% style="width:191px" %)D – End of Period|(% style="width:264px" %) |(% style="width:167px" %)1981-12-31 549 +When the source frequency is lower than the target frequency additional information 3485 can be provided for resolve to start of period, end of period, or mid period, as shown 3486 in the following example: 550 550 551 +Source Value Source Mapping Target Frequency Output 552 + 553 +Dimension 554 + 555 + 1981 yyyy D – End of Period 1981-12-31 556 + 551 551 When the start of year is April 1^^st^^ the Structure Map has YearStart=04-01: 552 552 553 -(% style="width:892.294px" %) 554 -|(% style="width:165px" %)**Source Value**|(% style="width:133px" %)**Source Mapping**|(% style="width:191px" %)**Target Dimension**|(% style="width:264px" %)**Frequency**|(% style="width:167px" %)**Output** 555 -|(% style="width:165px" %)1981|(% style="width:133px" %)yyyy|(% style="width:191px" %)D – End of Period|(% style="width:264px" %) |(% style="width:167px" %)1982-03-31 559 +Source Value Source Mapping Target Frequency Output 556 556 557 - ----561 +Dimension 558 558 563 +1981 yyyy D – End of Period 1982-03-31 564 + 559 559 {{putFootnotes/}}