Last modified by Helena on 2025/09/10 11:19

From version 3.11
edited by Helena
on 2025/05/15 23:59
Change comment: There is no comment for this version
To version 3.8
edited by Helena
on 2025/05/15 23:56
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -138,13 +138,12 @@
138 138  
139 139  The hierarchy of time formats is as follows (**bold** indicates a category which is made up of multiple formats, //italic// indicates a distinct format):
140 140  
141 -* **Observational Time Period**
142 -** **Standard Time Period**
143 -*** **Basic Time Period**
144 -**** **Gregorian Time Period**
145 -**** //Date Time//
146 -*** **Reporting Time Period**
147 -** **//Time Range//**
141 +* **Observational Time Period **o **Standard Time Period**
142 +* **Basic Time Period**
143 +* **Gregorian Time Period**
144 +** //Date Time//
145 +* **Reporting Time Period**
146 +**//Time Range//**
148 148  
149 149  The details of these time period categories and of the distinct formats which make them up are detailed in the sections to follow.
150 150  
... ... @@ -164,16 +164,12 @@
164 164  
165 165  Representation: xs:gYear (YYYY)
166 166  
167 -Period: the start of January 1 to the end of December 31
166 +Period: the start of January 1 to the end of December 31 **Gregorian Year Month**:
168 168  
169 -**Gregorian Year Month**:
170 -
171 171  Representation: xs:gYearMonth (YYYY-MM)
172 172  
173 -Period: the start of the first day of the month to end of the last day of the month
170 +Period: the start of the first day of the month to end of the last day of the month **Gregorian Day**:
174 174  
175 -**Gregorian Day**:
176 -
177 177  Representation: xs:date (YYYY-MM-DD)
178 178  
179 179  Period: the start of the day (00:00:00) to the end of the day (23:59:59)
... ... @@ -182,7 +182,7 @@
182 182  
183 183  This is used to unambiguously state that a date-time represents an observation at a single point in time. Therefore, if one wants to use SDMX for data which is measured at a distinct point in time rather than being reported over a period, the date-time representation can be used.
184 184  
185 -Representation: xs:dateTime (YYYY-MM-DDThh:mm:ss){{footnote}}The seconds can be reported fractionally{{/footnote}}
180 +Representation: xs:dateTime (YYYY-MM-DDThh:mm:ss)^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^2^^>>path:#sdfootnote2sym||name="sdfootnote2anc"]](%%)^^
186 186  
187 187  === {{id name="_Toc291512"/}}4.2.6 Standard Reporting Period ===
188 188  
... ... @@ -216,6 +216,8 @@
216 216  
217 217  Representation: common:ReportingSemesterType (YYYY-Ss, e.g. 2000-S2)
218 218  
214 +[[image:SDMX 3-0-0 SECTION 6 FINAL-1.0_en_59eee18f.gif||alt="Shape2" height="1" width="192"]]
215 +
219 219  **Reporting Trimester:**
220 220  
221 221  Period Indicator: T
... ... @@ -254,7 +254,7 @@
254 254  
255 255  Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53)
256 256  
257 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
254 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
258 258  
259 259  **Reporting Day**:
260 260  
... ... @@ -288,19 +288,19 @@
288 288  
289 289  This is the [REPORTING_YEAR_START_DATE]
290 290  
291 -1.
288 +1.
292 292  11. **If the [PERIOD_INDICATOR] is W:**
293 293  111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:**
294 294  
295 -Add^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^4^^>>path:#sdfootnote4sym||name="sdfootnote4anc"]](%%)^^ (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
292 +Add^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^4^^>>path:#sdfootnote4sym||name="sdfootnote4anc"]](%%)^^ (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
296 296  
297 -1.
298 -11.
294 +1.
295 +11.
299 299  111. **If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
300 300  
301 301  Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
302 302  
303 -1.
300 +1.
304 304  11. **Else:**
305 305  
306 306  The [REPORTING_YEAR_START_DATE] is the [REPORTING_YEAR_BASE].