Last modified by Helena on 2025/09/10 11:19

From version 3.11
edited by Helena
on 2025/05/15 23:59
Change comment: There is no comment for this version
To version 4.4
edited by Helena
on 2025/05/16 11:16
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -206,8 +206,10 @@
206 206  
207 207  Limit per year: 1
208 208  
209 -Representation: common:ReportingYearType (YYYY-A1, e.g. 2000-A1) **Reporting Semester:**
209 +Representation: common:ReportingYearType (YYYY-A1, e.g. 2000-A1)
210 210  
211 +**Reporting Semester:**
212 +
211 211  Period Indicator: S
212 212  
213 213  Period Duration: P6M (six months)
... ... @@ -224,8 +224,10 @@
224 224  
225 225  Limit per year: 3
226 226  
227 -Representation: common:ReportingTrimesterType (YYYY-Tt, e.g. 2000-T3) **Reporting Quarter:**
229 +Representation: common:ReportingTrimesterType (YYYY-Tt, e.g. 2000-T3)
228 228  
231 +**Reporting Quarter:**
232 +
229 229  Period Indicator: Q
230 230  
231 231  Period Duration: P3M (three months)
... ... @@ -232,8 +232,10 @@
232 232  
233 233  Limit per year: 4
234 234  
235 -Representation: common:ReportingQuarterType (YYYY-Qq, e.g. 2000-Q4) **Reporting Month**:
239 +Representation: common:ReportingQuarterType (YYYY-Qq, e.g. 2000-Q4)
236 236  
241 +**Reporting Month**:
242 +
237 237  Period Indicator: M
238 238  
239 239  Period Duration: P1M (one month)
... ... @@ -254,7 +254,7 @@
254 254  
255 255  Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53)
256 256  
257 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
263 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
258 258  
259 259  **Reporting Day**:
260 260  
... ... @@ -274,49 +274,38 @@
274 274  
275 275  (REPORTING_YEAR_START_DAY) and a fixed representation (xs:gMonthDay) so that it can always be easily identified and processed in a data message. Although this attribute exists in specialized sub-class, it functions the same as any other attribute outside of its identification and representation. It must takes its identity from a concept and state its relationship with other components of the data structure definition. The ability to state this relationship allows this reporting year start day attribute to exist at the appropriate levels of a data message. In the absence of this attribute, the reporting year start date is assumed to be January 1; therefore if the reporting year coincides with the calendar year, this Attribute is not necessary.
276 276  
277 -Since the duration and the reporting year start day are known for any reporting period, it is possible to relate any reporting period to a distinct calendar period. The actual
283 +Since the duration and the reporting year start day are known for any reporting period, it is possible to relate any reporting period to a distinct calendar period. The actual Gregorian calendar period covered by the reporting period can be computed as follows (based on the standard format of [REPROTING_YEAR]-[PERIOD_INDICATOR][PERIOD_VALUE] and the reporting year start day as [REPORTING_YEAR_START_DAY]):
278 278  
279 -Gregorian calendar period covered by the reporting period can be computed as follows
285 +**~1. Determine [REPORTING_YEAR_BASE]:**
280 280  
281 -(based on the standard format of [REPROTING_YEAR]-
282 -
283 -[PERIOD_INDICATOR][PERIOD_VALUE] and the reporting year start day as [REPORTING_YEAR_START_DAY]):
284 -
285 -1. **Determine [REPORTING_YEAR_BASE]:**
286 -
287 287  Combine [REPORTING_YEAR] of the reporting period value (YYYY) with [REPORTING_YEAR_START_DAY] (MM-DD) to get a date (YYYY-MM-DD).
288 -
289 289  This is the [REPORTING_YEAR_START_DATE]
290 290  
291 -1.
292 -11. **If the [PERIOD_INDICATOR] is W:**
293 -111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:**
290 +**a) If the [PERIOD_INDICATOR] is W:**
294 294  
295 -Add^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^4^^>>path:#sdfootnote4sym||name="sdfootnote4anc"]](%%)^^ (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
292 +~1. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday**:
293 +Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes for further details.{{/footnote}} (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
296 296  
297 -1.
298 -11.
299 -111. **If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
300 -
295 +**2. If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
301 301  Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
302 302  
303 -1.
304 -11. **Else:**
305 -
298 +**b) Else:**
306 306  The [REPORTING_YEAR_START_DATE] is the [REPORTING_YEAR_BASE].
307 307  
308 -1. **Determine [PERIOD_DURATION]:**
309 -11. If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.
310 -11. If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.
311 -11. If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.
312 -11. If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.
313 -11. If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.
314 -11. If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.
315 -11. If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.
316 -1. **Determine [PERIOD_START]:**
301 +**2. Determine [PERIOD_DURATION]:**
302 +a) If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.
303 +b) If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.
304 +c) If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.
305 +d) If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.
306 +e) If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.
307 +f) If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.
308 +g) If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.
309 +**3. Determine [PERIOD_START]:**
317 317  
318 -Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add^^4^^ this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START]. **4. Determine the [PERIOD_END]:**
311 +Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add^^4^^ this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START].
319 319  
313 +**4. Determine the [PERIOD_END]:**
314 +
320 320  Multiply the [PERIOD_VALUE] by the [PERIOD_DURATION]. Add^^4^^ this to the [REPORTING_YEAR_BASE] add^^4^^ -P1D. The result is the [PERIOD_END].
321 321  
322 322  For all of these ranges, the bounds include the beginning of the [PERIOD_START] (i.e. 00:00:00) and the end of the [PERIOD_END] (i.e. 23:59:59).
... ... @@ -381,29 +381,29 @@
381 381  
382 382  In version 2.0 of SDMX there is a recommendation to use the time format attribute to gives additional information on the way time is represented in the message. Following an appraisal of its usefulness this is no longer required. However, it is still possible, if required , to include the time format attribute in SDMX-ML.
383 383  
384 -|Code|Format
385 -|OTP|Observational Time Period: Superset of all SDMX time formats (Gregorian Time Period, Reporting Time Period, and Time Range)
386 -|STP|Standard Time Period: Superset of Gregorian and Reporting Time Periods
387 -|GTP|Superset of all Gregorian Time Periods and date-time
388 -|RTP|Superset of all Reporting Time Periods
389 -|TR|(((
390 -Time Range: Start time and duration (YYYY-MM-
391 -
392 -DD(Thh:mm:ss)?/<duration>)
379 +(% style="width:771.294px" %)
380 +|Code|(% style="width:659px" %)Format
381 +|OTP|(% style="width:659px" %)Observational Time Period: Superset of all SDMX time formats (Gregorian Time Period, Reporting Time Period, and Time Range)
382 +|STP|(% style="width:659px" %)Standard Time Period: Superset of Gregorian and Reporting Time Periods
383 +|GTP|(% style="width:659px" %)Superset of all Gregorian Time Periods and date-time
384 +|RTP|(% style="width:659px" %)Superset of all Reporting Time Periods
385 +|TR|(% style="width:659px" %)(((
386 +Time Range: Start time and duration (YYYY-MM-DD(Thh:mm:ss)?/<duration>)
393 393  )))
394 -|GY|Gregorian Year (YYYY)
395 -|GTM|Gregorian Year Month (YYYY-MM)
396 -|GD|Gregorian Day (YYYY-MM-DD)
397 -|DT|Distinct Point: date-time (YYYY-MM-DDThh:mm:ss)
398 -|RY|Reporting Year (YYYY-A1)
399 -|RS|Reporting Semester (YYYY-Ss)
400 -|RT|Reporting Trimester (YYYY-Tt)
401 -|RQ|Reporting Quarter (YYYY-Qq)
402 -|RM|Reporting Month (YYYY-Mmm)
403 -|RW|Reporting Week (YYYY-Www)
404 -|RD|Reporting Day (YYYY-Dddd)
388 +|GY|(% style="width:659px" %)Gregorian Year (YYYY)
389 +|GTM|(% style="width:659px" %)Gregorian Year Month (YYYY-MM)
390 +|GD|(% style="width:659px" %)Gregorian Day (YYYY-MM-DD)
391 +|DT|(% style="width:659px" %)Distinct Point: date-time (YYYY-MM-DDThh:mm:ss)
392 +|RY|(% style="width:659px" %)Reporting Year (YYYY-A1)
393 +|RS|(% style="width:659px" %)Reporting Semester (YYYY-Ss)
394 +|RT|(% style="width:659px" %)Reporting Trimester (YYYY-Tt)
395 +|RQ|(% style="width:659px" %)Reporting Quarter (YYYY-Qq)
396 +|RM|(% style="width:659px" %)Reporting Month (YYYY-Mmm)
397 +|RW|(% style="width:659px" %)Reporting Week (YYYY-Www)
398 +|RD|(% style="width:659px" %)Reporting Day (YYYY-Dddd)
405 405  
406 -==== Table 1: SDMX-ML Time Format Codes ====
400 +(% class="wikigeneratedid" id="HTable1:SDMX-MLTimeFormatCodes" %)
401 +Table 1: SDMX-ML Time Format Codes
407 407  
408 408  === {{id name="_Toc291515"/}}4.2.9 Time Zones ===
409 409  
... ... @@ -450,12 +450,13 @@
450 450  
451 451  Fundamental to processing a time value parameter in a query message is understanding that all time periods should be handled as a distinct range of time. Since the time parameter in the query is paired with an operator, this also effectively represents a distinct range of time. Therefore, a system processing the query must simply match the data where the time period for requested parameter is encompassed by the time period resulting from value of the query parameter. The following table details how the operators should be interpreted for any time period provided as a parameter.
452 452  
453 -|**Operator**|**Rule**
454 -|Greater Than|Any data after the last moment of the period
455 -|Less Than|Any data before the first moment of the period
456 -|Greater Than or Equal To|Any data on or after the first moment of the period
457 -|Less Than or Equal To|Any data on or before the last moment of the period
458 -|Equal To|Any data which falls on or after the first moment of the period and before or on the last moment of the period
448 +(% style="width:1020.29px" %)
449 +|(% style="width:236px" %)**Operator**|(% style="width:781px" %)**Rule**
450 +|(% style="width:236px" %)Greater Than|(% style="width:781px" %)Any data after the last moment of the period
451 +|(% style="width:236px" %)Less Than|(% style="width:781px" %)Any data before the first moment of the period
452 +|(% style="width:236px" %)Greater Than or Equal To|(% style="width:781px" %)Any data on or after the first moment of the period
453 +|(% style="width:236px" %)Less Than or Equal To|(% style="width:781px" %)Any data on or before the last moment of the period
454 +|(% style="width:236px" %)Equal To|(% style="width:781px" %)Any data which falls on or after the first moment of the period and before or on the last moment of the period
459 459  
460 460  Reporting Time Periods as query parameters are handled like this: any data within the bounds of the reporting period for the year is matched, regardless of the actual start day of the reporting year. In addition, data reported against a normal calendar period is matched if it falls within the bounds of the time parameter based on a reporting year start day of January 1. When determining whether another reporting period falls within the bounds of a report period query parameter, one will have to take into account the actual time period to compare weeks and days to higher order report periods. This will be demonstrated in the examples to follow.
461 461  
... ... @@ -504,7 +504,7 @@
504 504  
505 505  Versioning operates at the level of versionable and maintainable objects in the SDMX information model. Within the SDMX Structure and MetadataSet messages, there is a well-defined pattern for artefact versioning and referencing. The artefact identifiers are qualified by their version numbers – that is, an object with an Agency of "A", and ID of "X" and a version of "1.0.0" is a different object than one with an Agency of "A", an ID of "X", and a version of "1.1.0".
506 506  
507 -As of SDMX 3.0, the versioning rules are extended to allow for truly versioned artefacts through the implementation of the rules of the well-known practice called "Semantic Versioning" [[(>>url:http://semver.org/]][[__http:~~/~~/semver.org__>>url:http://semver.org/]][[)>>url:http://semver.org/]], in addition to the legacy non-restrictive versioning scheme. In addition, the "isFinal" property is removed from //MaintainableArtefact//. According to the legacy versioning, any artefact defined without a version is equivalent to following the legacy versioning, thus having version ‘1.0’.
503 +As of SDMX 3.0, the versioning rules are extended to allow for truly versioned artefacts through the implementation of the rules of the well-known practice called "Semantic Versioning" ([[__http:~~/~~/semver.org__>>https://http:semver.org]]), in addition to the legacy non-restrictive versioning scheme. In addition, the "isFinal" property is removed from //MaintainableArtefact//. According to the legacy versioning, any artefact defined without a version is equivalent to following the legacy versioning, thus having version ‘1.0’.
508 508  
509 509  === 4.3.1 Non-versioned artefacts ===
510 510  
... ... @@ -512,8 +512,6 @@
512 512  
513 513  Many existing organisation’s data management systems work with version-less structures and apply ad-hoc structural metadata governance processes. The new nonversioned artefacts will allow supporting those numerous situations, where organisations do not manage version numbers.
514 514  
515 -[[image:SDMX 3-0-0 SECTION 6 FINAL-1.0_en_59eee18f.gif||alt="Shape3" height="1" width="192"]]
516 -
517 517  2010-Q3 (with a reporting year start day of ~-~-01-01) starts on 2010-07-01. This is day 4 of week 26, therefore the first week matched is week 27.
518 518  
519 519  2010-Q3 (with a reporting year start day of ~-~-07-01) starts on 2011-01-01. This is day 6 of week 27, therefore the first week matched is week 28.