261 261  Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53)
262 262  
263 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
263 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
264 264  
265 265  **Reporting Day**:
266 266  
... ... @@ -282,38 +282,31 @@
282 282  
283 283  Since the duration and the reporting year start day are known for any reporting period, it is possible to relate any reporting period to a distinct calendar period. The actual Gregorian calendar period covered by the reporting period can be computed as follows (based on the standard format of [REPROTING_YEAR]-[PERIOD_INDICATOR][PERIOD_VALUE] and the reporting year start day as [REPORTING_YEAR_START_DAY]):
284 284  
285 -1. **Determine [REPORTING_YEAR_BASE]:**
285 +**~1. Determine [REPORTING_YEAR_BASE]:**
286 286  
287 287  Combine [REPORTING_YEAR] of the reporting period value (YYYY) with [REPORTING_YEAR_START_DAY] (MM-DD) to get a date (YYYY-MM-DD).
288 -
289 289  This is the [REPORTING_YEAR_START_DATE]
290 290  
291 -1.
292 -11. **If the [PERIOD_INDICATOR] is W:**
293 -111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:**
290 +**a) If the [PERIOD_INDICATOR] is W:**
294 294  
292 +~1. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday**:
295 295  Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes for further details.{{/footnote}} (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
296 296  
297 -1.
298 -11.
299 -111. **If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
300 -
295 +**2. If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
301 301  Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
302 302  
303 -1.
304 -11. **Else:**
305 -
298 +**b) Else:**
306 306  The [REPORTING_YEAR_START_DATE] is the [REPORTING_YEAR_BASE].
307 307  
308 -1. **Determine [PERIOD_DURATION]:**
309 -11. If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.
310 -11. If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.
311 -11. If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.
312 -11. If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.
313 -11. If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.
314 -11. If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.
315 -11. If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.
316 -1. **Determine [PERIOD_START]:**
301 +**2. Determine [PERIOD_DURATION]:**
302 +a) If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.
303 +b) If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.
304 +c) If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.
305 +d) If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.
306 +e) If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.
307 +f) If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.
308 +g) If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.
309 +**3. Determine [PERIOD_START]:**
317 317  
318 318  Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add^^4^^ this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START].
319 319