Last modified by Helena on 2025/09/10 11:19

From version 4.2
edited by Helena
on 2025/05/16 11:11
Change comment: There is no comment for this version
To version 4.7
edited by Helena
on 2025/05/16 11:22
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -260,7 +260,7 @@
260 260  
261 261  Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53)
262 262  
263 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
263 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
264 264  
265 265  **Reporting Day**:
266 266  
... ... @@ -282,38 +282,31 @@
282 282  
283 283  Since the duration and the reporting year start day are known for any reporting period, it is possible to relate any reporting period to a distinct calendar period. The actual Gregorian calendar period covered by the reporting period can be computed as follows (based on the standard format of [REPROTING_YEAR]-[PERIOD_INDICATOR][PERIOD_VALUE] and the reporting year start day as [REPORTING_YEAR_START_DAY]):
284 284  
285 -1. **Determine [REPORTING_YEAR_BASE]:**
285 +**~1. Determine [REPORTING_YEAR_BASE]:**
286 286  
287 287  Combine [REPORTING_YEAR] of the reporting period value (YYYY) with [REPORTING_YEAR_START_DAY] (MM-DD) to get a date (YYYY-MM-DD).
288 -
289 289  This is the [REPORTING_YEAR_START_DATE]
290 290  
291 -1.
292 -11. **If the [PERIOD_INDICATOR] is W:**
293 -111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:**
290 +**a) If the [PERIOD_INDICATOR] is W:**
294 294  
295 -Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes for further details.{{/footnote}} (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
292 + ~1. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday**:
293 + Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes for further details.{{/footnote}} (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
296 296  
297 -1.
298 -11.
299 -111. **If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
295 +**~ 2. If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
296 + Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
300 300  
301 -Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
302 -
303 -1.
304 -11. **Else:**
305 -
298 +**b) Else:**
306 306  The [REPORTING_YEAR_START_DATE] is the [REPORTING_YEAR_BASE].
307 307  
308 -1. **Determine [PERIOD_DURATION]:**
309 -11. If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.
310 -11. If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.
311 -11. If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.
312 -11. If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.
313 -11. If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.
314 -11. If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.
315 -11. If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.
316 -1. **Determine [PERIOD_START]:**
301 +**2. Determine [PERIOD_DURATION]:**
302 +a) If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.
303 +b) If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.
304 +c) If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.
305 +d) If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.
306 +e) If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.
307 +f) If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.
308 +g) If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.
309 +**3. Determine [PERIOD_START]:**
317 317  
318 318  Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add^^4^^ this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START].
319 319  
... ... @@ -326,53 +326,34 @@
326 326  **Examples:**
327 327  
328 328  **2010-Q2, REPORTING_YEAR_START_DAY = ~-~-07-01 (July 1)**
322 +~1. [REPORTING_YEAR_START_DATE] = 2010-07-01
323 + b) [REPORTING_YEAR_BASE] = 2010-07-01
324 +2. [PERIOD_DURATION] = P3M
325 +3. (2-1) * P3M = P3M
326 + 2010-07-01 + P3M = 2010-10-01
327 + [PERIOD_START] = 2010-10-01
329 329  
330 -1. [REPORTING_YEAR_START_DATE] = 2010-07-01
329 +4. 2 * P3M = P6M
330 + 2010-07-01 + P6M = 2010-13-01 = 2011-01-01
331 + 2011-01-01 + -P1D = 2010-12-31
332 + [PERIOD_END] = 2010-12-31
331 331  
332 -b) [REPORTING_YEAR_BASE] = 2010-07-01
333 -
334 -1. [PERIOD_DURATION] = P3M
335 -1. (2-1) * P3M = P3M
336 -
337 -2010-07-01 + P3M = 2010-10-01
338 -
339 -[PERIOD_START] = 2010-10-01
340 -
341 -1. 2 * P3M = P6M
342 -
343 -2010-07-01 + P6M = 2010-13-01 = 2011-01-01
344 -
345 -2011-01-01 + -P1D = 2010-12-31
346 -
347 -[PERIOD_END] = 2010-12-31
348 -
349 349  The actual calendar range covered by 2010-Q2 (assuming the reporting year begins July 1) is 2010-10-01T00:00:00/2010-12-31T23:59:59
350 350  
351 351  **2011-W36, REPORTING_YEAR_START_DAY = ~-~-07-01 (July 1)**
337 +~1. [REPORTING_YEAR_START_DATE] = 2010-07-01
338 + a) 2011-07-01 = Friday
339 + 2011-07-01 + P3D = 2011-07-04
340 + [REPORTING_YEAR_BASE] = 2011-07-04
341 +2. [PERIOD_DURATION] = P7D
342 +3. (36-1) * P7D = P245D
343 + 2011-07-04 + P245D = 2012-03-05
344 + [PERIOD_START] = 2012-03-05
345 +4. 36 * P7D = P252D
346 + 2011-07-04 + P252D =2012-03-12
347 + 2012-03-12 + -P1D = 2012-03-11
348 + [PERIOD_END] = 2012-03-11
352 352  
353 -1. [REPORTING_YEAR_START_DATE] = 2010-07-01
354 -
355 -a) 2011-07-01 = Friday
356 -
357 -2011-07-01 + P3D = 2011-07-04
358 -
359 -[REPORTING_YEAR_BASE] = 2011-07-04
360 -
361 -1. [PERIOD_DURATION] = P7D
362 -1. (36-1) * P7D = P245D
363 -
364 -2011-07-04 + P245D = 2012-03-05
365 -
366 -[PERIOD_START] = 2012-03-05
367 -
368 -1. 36 * P7D = P252D
369 -
370 -2011-07-04 + P252D =2012-03-12
371 -
372 -2012-03-12 + -P1D = 2012-03-11
373 -
374 -[PERIOD_END] = 2012-03-11
375 -
376 376  The actual calendar range covered by 2011-W36 (assuming the reporting year begins July 1) is 2012-03-05T00:00:00/2012-03-11T23:59:59
377 377  
378 378  === {{id name="_Toc291513"/}}4.2.7 Distinct Range ===
... ... @@ -384,7 +384,7 @@
384 384  In version 2.0 of SDMX there is a recommendation to use the time format attribute to gives additional information on the way time is represented in the message. Following an appraisal of its usefulness this is no longer required. However, it is still possible, if required , to include the time format attribute in SDMX-ML.
385 385  
386 386  (% style="width:771.294px" %)
387 -|Code|(% style="width:659px" %)Format
361 +|**Code**|(% style="width:659px" %)**Format**
388 388  |OTP|(% style="width:659px" %)Observational Time Period: Superset of all SDMX time formats (Gregorian Time Period, Reporting Time Period, and Time Range)
389 389  |STP|(% style="width:659px" %)Standard Time Period: Superset of Gregorian and Reporting Time Periods
390 390  |GTP|(% style="width:659px" %)Superset of all Gregorian Time Periods and date-time