Changes for page 4 General Notes for Implementers
Last modified by Helena on 2025/09/10 11:19
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -260,7 +260,7 @@ 260 260 261 261 Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53) 262 262 263 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.263 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods. 264 264 265 265 **Reporting Day**: 266 266 ... ... @@ -282,33 +282,38 @@ 282 282 283 283 Since the duration and the reporting year start day are known for any reporting period, it is possible to relate any reporting period to a distinct calendar period. The actual Gregorian calendar period covered by the reporting period can be computed as follows (based on the standard format of [REPROTING_YEAR]-[PERIOD_INDICATOR][PERIOD_VALUE] and the reporting year start day as [REPORTING_YEAR_START_DAY]): 284 284 285 - **~1. Determine [REPORTING_YEAR_BASE]:**285 +1. **Determine [REPORTING_YEAR_BASE]:** 286 286 287 287 Combine [REPORTING_YEAR] of the reporting period value (YYYY) with [REPORTING_YEAR_START_DAY] (MM-DD) to get a date (YYYY-MM-DD). 288 + 288 288 This is the [REPORTING_YEAR_START_DATE] 289 289 290 -**a) If the [PERIOD_INDICATOR] is W:** 291 -~1. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday**: 291 +1. 292 +11. **If the [PERIOD_INDICATOR] is W:** 293 +111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:** 292 292 293 293 Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes for further details.{{/footnote}} (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 294 294 295 -**2. If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:** 297 +1. 298 +11. 299 +111. **If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:** 296 296 297 297 Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 298 298 299 -**b) Else:** 303 +1. 304 +11. **Else:** 300 300 301 301 The [REPORTING_YEAR_START_DATE] is the [REPORTING_YEAR_BASE]. 302 302 303 - **2. Determine [PERIOD_DURATION]:**304 - a)If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.305 - b)If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.306 - c)If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.307 - d)If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.308 - e)If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.309 - f)If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.310 - g)If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.311 - **3. Determine [PERIOD_START]:**308 +1. **Determine [PERIOD_DURATION]:** 309 +11. If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y. 310 +11. If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M. 311 +11. If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M. 312 +11. If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M. 313 +11. If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M. 314 +11. If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D. 315 +11. If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D. 316 +1. **Determine [PERIOD_START]:** 312 312 313 313 Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add^^4^^ this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START]. 314 314