Changes for page 4 General Notes for Implementers
Last modified by Helena on 2025/09/10 11:19
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -260,7 +260,7 @@ 260 260 261 261 Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53) 262 262 263 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.263 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods. 264 264 265 265 **Reporting Day**: 266 266 ... ... @@ -282,31 +282,38 @@ 282 282 283 283 Since the duration and the reporting year start day are known for any reporting period, it is possible to relate any reporting period to a distinct calendar period. The actual Gregorian calendar period covered by the reporting period can be computed as follows (based on the standard format of [REPROTING_YEAR]-[PERIOD_INDICATOR][PERIOD_VALUE] and the reporting year start day as [REPORTING_YEAR_START_DAY]): 284 284 285 - **~1. Determine [REPORTING_YEAR_BASE]:**285 +1. **Determine [REPORTING_YEAR_BASE]:** 286 286 287 287 Combine [REPORTING_YEAR] of the reporting period value (YYYY) with [REPORTING_YEAR_START_DAY] (MM-DD) to get a date (YYYY-MM-DD). 288 + 288 288 This is the [REPORTING_YEAR_START_DATE] 289 289 290 -**a) If the [PERIOD_INDICATOR] is W:** 291 +1. 292 +11. **If the [PERIOD_INDICATOR] is W:** 293 +111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:** 291 291 292 - ~1. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday**: 293 - Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes for further details.{{/footnote}} (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 295 +Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes for further details.{{/footnote}} (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 294 294 295 -**~ 2. If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:** 296 - Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 297 +1. 298 +11. 299 +111. **If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:** 297 297 298 -**b) Else:** 301 +Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 302 + 303 +1. 304 +11. **Else:** 305 + 299 299 The [REPORTING_YEAR_START_DATE] is the [REPORTING_YEAR_BASE]. 300 300 301 - **2. Determine [PERIOD_DURATION]:**302 - a)If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.303 - b)If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.304 - c)If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.305 - d)If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.306 - e)If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.307 - f)If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.308 - g)If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.309 - **3. Determine [PERIOD_START]:**308 +1. **Determine [PERIOD_DURATION]:** 309 +11. If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y. 310 +11. If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M. 311 +11. If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M. 312 +11. If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M. 313 +11. If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M. 314 +11. If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D. 315 +11. If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D. 316 +1. **Determine [PERIOD_START]:** 310 310 311 311 Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add^^4^^ this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START]. 312 312 ... ... @@ -319,34 +319,53 @@ 319 319 **Examples:** 320 320 321 321 **2010-Q2, REPORTING_YEAR_START_DAY = ~-~-07-01 (July 1)** 322 -~1. [REPORTING_YEAR_START_DATE] = 2010-07-01 323 - b) [REPORTING_YEAR_BASE] = 2010-07-01 324 -2. [PERIOD_DURATION] = P3M 325 -3. (2-1) * P3M = P3M 326 - 2010-07-01 + P3M = 2010-10-01 327 - [PERIOD_START] = 2010-10-01 328 328 329 -4. 2 * P3M = P6M 330 - 2010-07-01 + P6M = 2010-13-01 = 2011-01-01 331 - 2011-01-01 + -P1D = 2010-12-31 332 - [PERIOD_END] = 2010-12-31 330 +1. [REPORTING_YEAR_START_DATE] = 2010-07-01 333 333 332 +b) [REPORTING_YEAR_BASE] = 2010-07-01 333 + 334 +1. [PERIOD_DURATION] = P3M 335 +1. (2-1) * P3M = P3M 336 + 337 +2010-07-01 + P3M = 2010-10-01 338 + 339 +[PERIOD_START] = 2010-10-01 340 + 341 +1. 2 * P3M = P6M 342 + 343 +2010-07-01 + P6M = 2010-13-01 = 2011-01-01 344 + 345 +2011-01-01 + -P1D = 2010-12-31 346 + 347 +[PERIOD_END] = 2010-12-31 348 + 334 334 The actual calendar range covered by 2010-Q2 (assuming the reporting year begins July 1) is 2010-10-01T00:00:00/2010-12-31T23:59:59 335 335 336 336 **2011-W36, REPORTING_YEAR_START_DAY = ~-~-07-01 (July 1)** 337 -~1. [REPORTING_YEAR_START_DATE] = 2010-07-01 338 - a) 2011-07-01 = Friday 339 - 2011-07-01 + P3D = 2011-07-04 340 - [REPORTING_YEAR_BASE] = 2011-07-04 341 -2. [PERIOD_DURATION] = P7D 342 -3. (36-1) * P7D = P245D 343 - 2011-07-04 + P245D = 2012-03-05 344 - [PERIOD_START] = 2012-03-05 345 -4. 36 * P7D = P252D 346 - 2011-07-04 + P252D =2012-03-12 347 - 2012-03-12 + -P1D = 2012-03-11 348 - [PERIOD_END] = 2012-03-11 349 349 353 +1. [REPORTING_YEAR_START_DATE] = 2010-07-01 354 + 355 +a) 2011-07-01 = Friday 356 + 357 +2011-07-01 + P3D = 2011-07-04 358 + 359 +[REPORTING_YEAR_BASE] = 2011-07-04 360 + 361 +1. [PERIOD_DURATION] = P7D 362 +1. (36-1) * P7D = P245D 363 + 364 +2011-07-04 + P245D = 2012-03-05 365 + 366 +[PERIOD_START] = 2012-03-05 367 + 368 +1. 36 * P7D = P252D 369 + 370 +2011-07-04 + P252D =2012-03-12 371 + 372 +2012-03-12 + -P1D = 2012-03-11 373 + 374 +[PERIOD_END] = 2012-03-11 375 + 350 350 The actual calendar range covered by 2011-W36 (assuming the reporting year begins July 1) is 2012-03-05T00:00:00/2012-03-11T23:59:59 351 351 352 352 === {{id name="_Toc291513"/}}4.2.7 Distinct Range ===