Last modified by Helena on 2025/09/10 11:19

From version 4.7
edited by Helena
on 2025/05/16 11:22
Change comment: There is no comment for this version
To version 4.3
edited by Helena
on 2025/05/16 11:15
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -260,7 +260,7 @@
260 260  
261 261  Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53)
262 262  
263 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
263 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.^^[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^3^^>>path:#sdfootnote3sym||name="sdfootnote3anc"]](%%)^^ The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
264 264  
265 265  **Reporting Day**:
266 266  
... ... @@ -288,14 +288,16 @@
288 288  This is the [REPORTING_YEAR_START_DATE]
289 289  
290 290  **a) If the [PERIOD_INDICATOR] is W:**
291 +~1. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday**:
291 291  
292 - ~1. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday**:
293 - Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes for further details.{{/footnote}} (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
293 +Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes for further details.{{/footnote}} (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
294 294  
295 -**~ 2. If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
296 - Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
295 +**2. If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
297 297  
297 +Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
298 +
298 298  **b) Else:**
300 +
299 299  The [REPORTING_YEAR_START_DATE] is the [REPORTING_YEAR_BASE].
300 300  
301 301  **2. Determine [PERIOD_DURATION]:**
... ... @@ -319,34 +319,53 @@
319 319  **Examples:**
320 320  
321 321  **2010-Q2, REPORTING_YEAR_START_DAY = ~-~-07-01 (July 1)**
322 -~1. [REPORTING_YEAR_START_DATE] = 2010-07-01
323 - b) [REPORTING_YEAR_BASE] = 2010-07-01
324 -2. [PERIOD_DURATION] = P3M
325 -3. (2-1) * P3M = P3M
326 - 2010-07-01 + P3M = 2010-10-01
327 - [PERIOD_START] = 2010-10-01
328 328  
329 -4. 2 * P3M = P6M
330 - 2010-07-01 + P6M = 2010-13-01 = 2011-01-01
331 - 2011-01-01 + -P1D = 2010-12-31
332 - [PERIOD_END] = 2010-12-31
325 +1. [REPORTING_YEAR_START_DATE] = 2010-07-01
333 333  
327 +b) [REPORTING_YEAR_BASE] = 2010-07-01
328 +
329 +1. [PERIOD_DURATION] = P3M
330 +1. (2-1) * P3M = P3M
331 +
332 +2010-07-01 + P3M = 2010-10-01
333 +
334 +[PERIOD_START] = 2010-10-01
335 +
336 +1. 2 * P3M = P6M
337 +
338 +2010-07-01 + P6M = 2010-13-01 = 2011-01-01
339 +
340 +2011-01-01 + -P1D = 2010-12-31
341 +
342 +[PERIOD_END] = 2010-12-31
343 +
334 334  The actual calendar range covered by 2010-Q2 (assuming the reporting year begins July 1) is 2010-10-01T00:00:00/2010-12-31T23:59:59
335 335  
336 336  **2011-W36, REPORTING_YEAR_START_DAY = ~-~-07-01 (July 1)**
337 -~1. [REPORTING_YEAR_START_DATE] = 2010-07-01
338 - a) 2011-07-01 = Friday
339 - 2011-07-01 + P3D = 2011-07-04
340 - [REPORTING_YEAR_BASE] = 2011-07-04
341 -2. [PERIOD_DURATION] = P7D
342 -3. (36-1) * P7D = P245D
343 - 2011-07-04 + P245D = 2012-03-05
344 - [PERIOD_START] = 2012-03-05
345 -4. 36 * P7D = P252D
346 - 2011-07-04 + P252D =2012-03-12
347 - 2012-03-12 + -P1D = 2012-03-11
348 - [PERIOD_END] = 2012-03-11
349 349  
348 +1. [REPORTING_YEAR_START_DATE] = 2010-07-01
349 +
350 +a) 2011-07-01 = Friday
351 +
352 +2011-07-01 + P3D = 2011-07-04
353 +
354 +[REPORTING_YEAR_BASE] = 2011-07-04
355 +
356 +1. [PERIOD_DURATION] = P7D
357 +1. (36-1) * P7D = P245D
358 +
359 +2011-07-04 + P245D = 2012-03-05
360 +
361 +[PERIOD_START] = 2012-03-05
362 +
363 +1. 36 * P7D = P252D
364 +
365 +2011-07-04 + P252D =2012-03-12
366 +
367 +2012-03-12 + -P1D = 2012-03-11
368 +
369 +[PERIOD_END] = 2012-03-11
370 +
350 350  The actual calendar range covered by 2011-W36 (assuming the reporting year begins July 1) is 2012-03-05T00:00:00/2012-03-11T23:59:59
351 351  
352 352  === {{id name="_Toc291513"/}}4.2.7 Distinct Range ===
... ... @@ -358,7 +358,7 @@
358 358  In version 2.0 of SDMX there is a recommendation to use the time format attribute to gives additional information on the way time is represented in the message. Following an appraisal of its usefulness this is no longer required. However, it is still possible, if required , to include the time format attribute in SDMX-ML.
359 359  
360 360  (% style="width:771.294px" %)
361 -|**Code**|(% style="width:659px" %)**Format**
382 +|Code|(% style="width:659px" %)Format
362 362  |OTP|(% style="width:659px" %)Observational Time Period: Superset of all SDMX time formats (Gregorian Time Period, Reporting Time Period, and Time Range)
363 363  |STP|(% style="width:659px" %)Standard Time Period: Superset of Gregorian and Reporting Time Periods
364 364  |GTP|(% style="width:659px" %)Superset of all Gregorian Time Periods and date-time