Changes for page 13 Structure Mapping
Last modified by Artur on 2025/09/10 11:19
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -225,7 +225,7 @@ 225 225 226 226 The input 'G' matches on the last rule which is used as a catch-all or default in this example. 227 227 228 -=== 13. Substrings === 228 +=== 13.6.2 Substrings === 229 229 230 230 Substrings provide an alternative to regular expressions where the required section of an input value can be described using the number of the starting character, and the length of the substring in characters. The first character is at position 1. 231 231 ... ... @@ -551,23 +551,20 @@ 551 551 552 552 (% style="width:658.294px" %) 553 553 |(% style="width:143px" %)Source Value|(% style="width:163px" %) Start Period|(% style="width:176px" %)Interval|(% style="width:176px" %)Target FREQ|(% style="width:173px" %) Output 554 -|(% style="width:143px" %)1589808220|(% style="width:163px" %)1970|(% style="width:176px" %) millisecond|(% style="width:176px" %)M|(% style="width:173px" %)2020-05554 +|(% style="width:143px" %)1589808220|(% style="width:163px" %)1970|(% style="width:176px" %) millisecond|(% style="width:176px" %)M|(% style="width:173px" %)2020-05 555 555 556 556 When the source frequency is lower than the target frequency additional information 3568 can be provided for resolve to start of period, end of period, or mid period, as shown 3569 in the following example: 557 557 558 - Source Value Source Mapping Target Frequency Output 558 +(% style="width:666.294px" %) 559 +|(% style="width:131px" %) Source Value|(% style="width:143px" %)Source Mapping|(% style="width:149px" %)Target Dimension|(% style="width:114px" %)Frequency|(% style="width:126px" %)Output 560 +|(% style="width:131px" %)1981|(% style="width:143px" %)yyyy|(% style="width:149px" %)D – End of Period|(% style="width:114px" %) |(% style="width:126px" %)1981-12-31 559 559 560 - Dimension562 +When the start of year is April 1^^st^^ the Structure (% style="color:#e74c3c" %)Map(%%) has YearStart=04-01: 561 561 562 - 1981 yyyy D – End of Period 1981-12-31 564 +(% style="width:666.294px" %) 565 +|(% style="width:131px" %) Source Value|(% style="width:143px" %)Source Mapping|(% style="width:149px" %)Target Dimension|(% style="width:114px" %)Frequency|(% style="width:126px" %)Output 566 +|(% style="width:131px" %)1981|(% style="width:143px" %)yyyy|(% style="width:149px" %)D – End of Period|(% style="width:114px" %) |(% style="width:126px" %)1982-03-31 563 563 564 - 565 -When the start of year is April 1^^st^^ the Structure Map has YearStart=04-01: 566 - 567 - Source Value Source Mapping Target Frequency Output 568 - 569 -Dimension 570 - 571 571 ---- 572 572 573 573 {{putFootnotes/}}