Changes for page 4 General Notes for Implementers
Last modified by Artur on 2025/09/10 11:19
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -103,7 +103,7 @@ 103 103 104 104 Further to the above, the mapping between the non-native data types is presented in the table below: 105 105 106 -|**SDMX Facet**|**XML Schema**|**JSON schema **"**pattern**"[[ (% class="wikiinternallink" %)^^~[1~]^^>>path:#_ftn1]](%%)**for "string" type**106 +|**SDMX Facet**|**XML Schema**|**JSON schema **"**pattern**"[[^^~[1~]^^>>path:#_ftn1]] **for "string" type** 107 107 |GregorianYear|xsd:gYear|((( 108 108 "^-?([1-9][0-9]{3,}|0[0-9]{3})(Z|(\+|-)((0[0- 109 109 ... ... @@ -194,7 +194,7 @@ 194 194 195 195 This is used to unambiguously state that a date-time represents an observation at a single point in time. Therefore, if one wants to use SDMX for data which is measured at a distinct point in time rather than being reported over a period, the date-time representation can be used. 196 196 197 -Representation: xs:dateTime (YYYY-MM-DDThh:mm:ss)[[ (% class="wikiinternallink" %)^^~[2~]^^>>path:#_ftn2]]197 +Representation: xs:dateTime (YYYY-MM-DDThh:mm:ss)[[^^~[2~]^^>>path:#_ftn2]] 198 198 199 199 === 4.2.6 Standard Reporting Period === 200 200 ... ... @@ -263,7 +263,7 @@ 263 263 264 264 Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53) 265 265 266 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.[[ (% class="wikiinternallink" %)^^~[3~]^^>>path:#_ftn3]](%%)The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.266 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.[[^^~[3~]^^>>path:#_ftn3]] The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods. 267 267 268 268 **Reporting Day**: 269 269 ... ... @@ -291,19 +291,19 @@ 291 291 292 292 This is the [REPORTING_YEAR_START_DATE] 293 293 294 -1. 294 +1. 295 295 11. **If the [PERIOD_INDICATOR] is W:** 296 296 111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:** 297 297 298 -Add[[ (% class="wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%)(P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].298 +Add[[^^~[4~]^^>>path:#_ftn4]] (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 299 299 300 -1. 301 -11. 300 +1. 301 +11. 302 302 111. **If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:** 303 303 304 304 Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 305 305 306 -1. 306 +1. 307 307 11. **Else:** 308 308 309 309 The [REPORTING_YEAR_START_DATE] is the [REPORTING_YEAR_BASE]. ... ... @@ -390,7 +390,9 @@ 390 390 |GTP|Superset of all Gregorian Time Periods and date-time 391 391 |RTP|Superset of all Reporting Time Periods 392 392 |TR|((( 393 -Time Range: Start time and duration (YYYY-MM-DD(Thh:mm:ss)?/<duration>) 393 +Time Range: Start time and duration (YYYY-MM- 394 + 395 +DD(Thh:mm:ss)?/<duration>) 394 394 ))) 395 395 |GY|Gregorian Year (YYYY) 396 396 |GTM|Gregorian Year Month (YYYY-MM) ... ... @@ -404,8 +404,7 @@ 404 404 |RW|Reporting Week (YYYY-Www) 405 405 |RD|Reporting Day (YYYY-Dddd) 406 406 407 -(% class="wikigeneratedid" id="HTable1:SDMX-MLTimeFormatCodes" %) 408 -**Table 1: SDMX-ML Time Format Codes** 409 +==== Table 1: SDMX-ML Time Format Codes ==== 409 409 410 410 === 4.2.9 Time Zones === 411 411 ... ... @@ -503,7 +503,7 @@ 503 503 * 2010-W28 or later (reporting year start day ~-~-07-01)^^6^^ 504 504 * 2010-D185 or later (reporting year start day ~-~-07-01) 505 505 506 -= 4.3 Versioning = 507 += 4.3 Versioning == 507 507 508 508 Versioning operates at the level of versionable and maintainable objects in the SDMX information model. Within the SDMX Structure and MetadataSet messages, there is a well-defined pattern for artefact versioning and referencing. The artefact identifiers are qualified by their version numbers – that is, an object with an Agency of "A", and ID of "X" and a version of "1.0.0" is a different object than one with an Agency of "A", an ID of "X", and a version of "1.1.0". 509 509