Changes for page 4 General Notes for Implementers
Last modified by Artur on 2025/09/10 11:19
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -241,7 +241,7 @@ 241 241 11. **If the [PERIOD_INDICATOR] is W:** 242 242 111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:** 243 243 244 -Add[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%) (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 244 +Add[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%) (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 245 245 246 246 1. 247 247 11. ... ... @@ -265,7 +265,7 @@ 265 265 1. If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D. 266 266 1. **Determine [PERIOD_START]:** 267 267 268 -Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add ^^4^^this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START].268 +Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-todateTimes for further details.{{/footnote}} this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START]. 269 269 270 270 1. **Determine the [PERIOD_END]:** 271 271