Last modified by Artur on 2025/09/10 11:19

From version 2.4
edited by Helena
on 2025/06/08 23:40
Change comment: There is no comment for this version
To version 2.11
edited by Helena
on 2025/06/08 23:48
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -162,11 +162,12 @@
162 162  A Gregorian time period is always represented by a Gregorian year, year-month, or day. These are all based on ISO 8601 dates. The representation in SDMX-ML messages and the period covered by each of the Gregorian time periods are as follows:
163 163  
164 164  **Gregorian Year:**
165 -
166 166  Representation: xs:gYear (YYYY)
167 -Period: the start of January 1 to the end of December 31 **Gregorian Year Month**:
166 +Period: the start of January 1 to the end of December 31
167 +**Gregorian Year Month**:
168 168  Representation: xs:gYearMonth (YYYY-MM)
169 -Period: the start of the first day of the month to end of the last day of the month **Gregorian Day**:
169 +Period: the start of the first day of the month to end of the last day of the month
170 +**Gregorian Day**:
170 170  Representation: xs:date (YYYY-MM-DD)
171 171  Period: the start of the day (00:00:00) to the end of the day (23:59:59)
172 172  
... ... @@ -174,7 +174,7 @@
174 174  
175 175  This is used to unambiguously state that a date-time represents an observation at a single point in time. Therefore, if one wants to use SDMX for data which is measured at a distinct point in time rather than being reported over a period, the date-time representation can be used.
176 176  
177 -Representation: xs:dateTime (YYYY-MM-DDThh:mm:ss)[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[2~]^^>>path:#_ftn2]]
178 +Representation: xs:dateTime (YYYY-MM-DDThh:mm:ss){{footnote}}The seconds can be reported fractionally{{/footnote}}
178 178  
179 179  === 4.2.6 Standard Reporting Period ===
180 180  
... ... @@ -190,85 +190,50 @@
190 190  The following section details each of the standard reporting periods defined in SDMX:
191 191  
192 192  **Reporting Year**:
193 -
194 - Period Indicator: A
195 -
194 +Period Indicator: A
196 196  Period Duration: P1Y (one year)
197 -
198 198  Limit per year: 1
199 -
200 -Representation: common:ReportingYearType (YYYY-A1, e.g. 2000-A1) **Reporting Semester:**
201 -
202 - Period Indicator: S
203 -
197 +Representation: common:ReportingYearType (YYYY-A1, e.g. 2000-A1)
198 +**Reporting Semester:**
199 +Period Indicator: S
204 204  Period Duration: P6M (six months)
205 -
206 206  Limit per year: 2
207 -
208 208  Representation: common:ReportingSemesterType (YYYY-Ss, e.g. 2000-S2)
209 -
210 210  **Reporting Trimester:**
211 -
212 - Period Indicator: T
213 -
204 +Period Indicator: T
214 214  Period Duration: P4M (four months)
215 -
216 216  Limit per year: 3
217 -
218 -Representation: common:ReportingTrimesterType (YYYY-Tt, e.g. 2000-T3) **Reporting Quarter:**
219 -
220 - Period Indicator: Q
221 -
207 +Representation: common:ReportingTrimesterType (YYYY-Tt, e.g. 2000-T3)
208 +**Reporting Quarter:**
209 +Period Indicator: Q
222 222  Period Duration: P3M (three months)
223 -
224 224  Limit per year: 4
225 -
226 -Representation: common:ReportingQuarterType (YYYY-Qq, e.g. 2000-Q4) **Reporting Month**:
227 -
212 +Representation: common:ReportingQuarterType (YYYY-Qq, e.g. 2000-Q4)
213 +**Reporting Month**:
228 228  Period Indicator: M
229 -
230 230  Period Duration: P1M (one month)
231 -
232 232  Limit per year: 1
233 -
234 234  Representation: common:ReportingMonthType (YYYY-Mmm, e.g. 2000-M12) Notes: The reporting month is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
235 -
236 236  **Reporting Week**:
237 -
238 238  Period Indicator: W
239 -
240 240  Period Duration: P7D (seven days)
241 -
242 242  Limit per year: 53
243 -
244 244  Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53)
245 -
246 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[3~]^^>>path:#_ftn3]](%%) The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
247 -
223 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.{{footnote}}ISO 8601 defines alternative definitions for the first week, all of which produce equivalent results. Any of these definitions could be substituted so long as they are in
224 +relation to the reporting year start day.{{/footnote}} The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
248 248  **Reporting Day**:
249 -
250 250  Period Indicator: D
251 -
252 252  Period Duration: P1D (one day)
253 -
254 254  Limit per year: 366
255 -
256 256  Representation: common:ReportingDayType (YYYY-Dddd, e.g. 2000-D366) Notes: There are either 365 or 366 days in a reporting year, depending on whether the reporting year includes leap day (February 29). The reporting day is always represented as three digits, therefore 1-99 are 0 padded (e.g. 001). This allows the values to be sorted chronologically using textual sorting methods.
257 -
258 258  The meaning of a reporting year is always based on the start day of the year and requires that the reporting year is expressed as the year at the start of the period. This start day is always the same for a reporting year, and is expressed as a day and a month (e.g. July 1). Therefore, the reporting year 2000 with a start day of July 1 begins on July 1, 2000.
259 259  
260 -A specialized attribute (reporting year start day) exists for the purpose of communicating the reporting year start day. This attribute has a fixed identifier
232 +A specialized attribute (reporting year start day) exists for the purpose of communicating the reporting year start day. This attribute has a fixed identifier (REPORTING_YEAR_START_DAY) and a fixed representation (xs:gMonthDay) so that it can always be easily identified and processed in a data message. Although this attribute exists in specialized sub-class, it functions the same as any other attribute outside of its identification and representation. It must takes its identity from a concept and state its relationship with other components of the data structure definition. The ability to state this relationship allows this reporting year start day attribute to exist at the appropriate levels of a data message. In the absence of this attribute, the reporting year start date is assumed to be January 1; therefore if the reporting year coincides with the calendar year, this Attribute is not necessary.
261 261  
262 -(REPORTING_YEAR_START_DAY) and a fixed representation (xs:gMonthDay) so that it can always be easily identified and processed in a data message. Although this attribute exists in specialized sub-class, it functions the same as any other attribute outside of its identification and representation. It must takes its identity from a concept and state its relationship with other components of the data structure definition. The ability to state this relationship allows this reporting year start day attribute to exist at the appropriate levels of a data message. In the absence of this attribute, the reporting year start date is assumed to be January 1; therefore if the reporting year coincides with the calendar year, this Attribute is not necessary.
234 +Since the duration and the reporting year start day are known for any reporting period, it is possible to relate any reporting period to a distinct calendar period. The actual Gregorian calendar period covered by the reporting period can be computed as follows (based on the standard format of [REPROTING_YEAR]-[PERIOD_INDICATOR][PERIOD_VALUE] and the reporting year start day as [REPORTING_YEAR_START_DAY]):
263 263  
264 -Since the duration and the reporting year start day are known for any reporting period, it is possible to relate any reporting period to a distinct calendar period. The actual Gregorian calendar period covered by the reporting period can be computed as follows (based on the standard format of [REPROTING_YEAR]-
265 -
266 -[PERIOD_INDICATOR][PERIOD_VALUE] and the reporting year start day as [REPORTING_YEAR_START_DAY]):
267 -
268 -1. **Determine [REPORTING_YEAR_BASE]:**
269 -
236 +**~1. Determine [REPORTING_YEAR_BASE]:**
270 270  Combine [REPORTING_YEAR] of the reporting period value (YYYY) with [REPORTING_YEAR_START_DAY] (MM-DD) to get a date (YYYY-MM-DD).
271 -
272 272  This is the [REPORTING_YEAR_START_DATE]
273 273  
274 274  1.
... ... @@ -275,7 +275,7 @@
275 275  11. **If the [PERIOD_INDICATOR] is W:**
276 276  111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:**
277 277  
278 -Add[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%) (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
244 +Add[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%) (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
279 279  
280 280  1.
281 281  11.
... ... @@ -288,14 +288,15 @@
288 288  
289 289  The [REPORTING_YEAR_START_DATE] is the [REPORTING_YEAR_BASE].
290 290  
291 -1. **Determine [PERIOD_DURATION]:**
292 -11. If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.
293 -11. If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.
294 -11. If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.
295 -11. If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.
296 -11. If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.
297 -11. If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.
298 -11. If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.
257 +**2. Determine [PERIOD_DURATION]:**
258 +
259 +1. If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.
260 +1. If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.
261 +1. If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.
262 +1. If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.
263 +1. If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.
264 +1. If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.
265 +1. If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.
299 299  1. **Determine [PERIOD_START]:**
300 300  
301 301  Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add^^4^^ this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START].
... ... @@ -364,25 +364,26 @@
364 364  
365 365  In version 2.0 of SDMX there is a recommendation to use the time format attribute to gives additional information on the way time is represented in the message. Following an appraisal of its usefulness this is no longer required. However, it is still possible, if required , to include the time format attribute in SDMX-ML.
366 366  
367 -|(% style="width:95px" %)Code|(% style="width:1520px" %)Format
368 -|(% style="width:95px" %)OTP|(% style="width:1520px" %)Observational Time Period: Superset of all SDMX time formats (Gregorian Time Period, Reporting Time Period, and Time Range)
369 -|(% style="width:95px" %)STP|(% style="width:1520px" %)Standard Time Period: Superset of Gregorian and Reporting Time Periods
370 -|(% style="width:95px" %)GTP|(% style="width:1520px" %)Superset of all Gregorian Time Periods and date-time
371 -|(% style="width:95px" %)RTP|(% style="width:1520px" %)Superset of all Reporting Time Periods
372 -|(% style="width:95px" %)TR|(% style="width:1520px" %)(((
334 +(% style="width:890.835px" %)
335 +|(% style="width:95px" %)**Code**|(% style="width:793px" %)**Format**
336 +|(% style="width:95px" %)OTP|(% style="width:793px" %)Observational Time Period: Superset of all SDMX time formats (Gregorian Time Period, Reporting Time Period, and Time Range)
337 +|(% style="width:95px" %)STP|(% style="width:793px" %)Standard Time Period: Superset of Gregorian and Reporting Time Periods
338 +|(% style="width:95px" %)GTP|(% style="width:793px" %)Superset of all Gregorian Time Periods and date-time
339 +|(% style="width:95px" %)RTP|(% style="width:793px" %)Superset of all Reporting Time Periods
340 +|(% style="width:95px" %)TR|(% style="width:793px" %)(((
373 373  Time Range: Start time and duration (YYYY-MM-DD(Thh:mm:ss)?/<duration>)
374 374  )))
375 -|(% style="width:95px" %)GY|(% style="width:1520px" %)Gregorian Year (YYYY)
376 -|(% style="width:95px" %)GTM|(% style="width:1520px" %)Gregorian Year Month (YYYY-MM)
377 -|(% style="width:95px" %)GD|(% style="width:1520px" %)Gregorian Day (YYYY-MM-DD)
378 -|(% style="width:95px" %)DT|(% style="width:1520px" %)Distinct Point: date-time (YYYY-MM-DDThh:mm:ss)
379 -|(% style="width:95px" %)RY|(% style="width:1520px" %)Reporting Year (YYYY-A1)
380 -|(% style="width:95px" %)RS|(% style="width:1520px" %)Reporting Semester (YYYY-Ss)
381 -|(% style="width:95px" %)RT|(% style="width:1520px" %)Reporting Trimester (YYYY-Tt)
382 -|(% style="width:95px" %)RQ|(% style="width:1520px" %)Reporting Quarter (YYYY-Qq)
383 -|(% style="width:95px" %)RM|(% style="width:1520px" %)Reporting Month (YYYY-Mmm)
384 -|(% style="width:95px" %)RW|(% style="width:1520px" %)Reporting Week (YYYY-Www)
385 -|(% style="width:95px" %)RD|(% style="width:1520px" %)Reporting Day (YYYY-Dddd)
343 +|(% style="width:95px" %)GY|(% style="width:793px" %)Gregorian Year (YYYY)
344 +|(% style="width:95px" %)GTM|(% style="width:793px" %)Gregorian Year Month (YYYY-MM)
345 +|(% style="width:95px" %)GD|(% style="width:793px" %)Gregorian Day (YYYY-MM-DD)
346 +|(% style="width:95px" %)DT|(% style="width:793px" %)Distinct Point: date-time (YYYY-MM-DDThh:mm:ss)
347 +|(% style="width:95px" %)RY|(% style="width:793px" %)Reporting Year (YYYY-A1)
348 +|(% style="width:95px" %)RS|(% style="width:793px" %)Reporting Semester (YYYY-Ss)
349 +|(% style="width:95px" %)RT|(% style="width:793px" %)Reporting Trimester (YYYY-Tt)
350 +|(% style="width:95px" %)RQ|(% style="width:793px" %)Reporting Quarter (YYYY-Qq)
351 +|(% style="width:95px" %)RM|(% style="width:793px" %)Reporting Month (YYYY-Mmm)
352 +|(% style="width:95px" %)RW|(% style="width:793px" %)Reporting Week (YYYY-Www)
353 +|(% style="width:95px" %)RD|(% style="width:793px" %)Reporting Day (YYYY-Dddd)
386 386  
387 387  (% class="wikigeneratedid" id="HTable1:SDMX-MLTimeFormatCodes" %)
388 388  **Table 1: SDMX-ML Time Format Codes**
... ... @@ -432,12 +432,13 @@
432 432  
433 433  Fundamental to processing a time value parameter in a query message is understanding that all time periods should be handled as a distinct range of time. Since the time parameter in the query is paired with an operator, this also effectively represents a distinct range of time. Therefore, a system processing the query must simply match the data where the time period for requested parameter is encompassed by the time period resulting from value of the query parameter. The following table details how the operators should be interpreted for any time period provided as a parameter.
434 434  
435 -|**Operator**|**Rule**
436 -|Greater Than|Any data after the last moment of the period
437 -|Less Than|Any data before the first moment of the period
438 -|Greater Than or Equal To|Any data on or after the first moment of the period
439 -|Less Than or Equal To|Any data on or before the last moment of the period
440 -|Equal To|Any data which falls on or after the first moment of the period and before or on the last moment of the period
403 +(% style="width:770.835px" %)
404 +|(% style="width:220px" %)**Operator**|(% style="width:548px" %)**Rule**
405 +|(% style="width:220px" %)Greater Than|(% style="width:548px" %)Any data after the last moment of the period
406 +|(% style="width:220px" %)Less Than|(% style="width:548px" %)Any data before the first moment of the period
407 +|(% style="width:220px" %)Greater Than or Equal To|(% style="width:548px" %)Any data on or after the first moment of the period
408 +|(% style="width:220px" %)Less Than or Equal To|(% style="width:548px" %)Any data on or before the last moment of the period
409 +|(% style="width:220px" %)Equal To|(% style="width:548px" %)Any data which falls on or after the first moment of the period and before or on the last moment of the period
441 441  
442 442  Reporting Time Periods as query parameters are handled like this: any data within the bounds of the reporting period for the year is matched, regardless of the actual start day of the reporting year. In addition, data reported against a normal calendar period is matched if it falls within the bounds of the time parameter based on a reporting year start day of January 1. When determining whether another reporting period falls within the bounds of a report period query parameter, one will have to take into account the actual time period to compare weeks and days to higher order report periods. This will be demonstrated in the examples to follow.
443 443  
... ... @@ -444,11 +444,8 @@
444 444  **Examples:**
445 445  
446 446  **Gregorian Period**
447 -
448 448  Query Parameter: Greater than 2010
449 -
450 450  Literal Interpretation: Any data where the start period occurs after 2010-1231T23:59:59.
451 -
452 452  Example Matches:
453 453  
454 454  * 2011 or later
... ... @@ -464,9 +464,7 @@
464 464  * 2010-D185 or later (reporting year start day ~-~-07-01 or later)
465 465  
466 466  **Reporting Period**
467 -
468 468  Query Parameter: Greater than or equal to 2010-Q3
469 -
470 470  Literal Interpretation: Any data with a reporting period where the start period is on or after the start period of 2010-Q3 for the same reporting year start day, or and data where the start period is on or after 2010-07-01. Example Matches:
471 471  
472 472  * 2011 or later
... ... @@ -487,12 +487,10 @@
487 487  
488 488  Versioning operates at the level of versionable and maintainable objects in the SDMX information model. Within the SDMX Structure and MetadataSet messages, there is a well-defined pattern for artefact versioning and referencing. The artefact identifiers are qualified by their version numbers – that is, an object with an Agency of "A", and ID of "X" and a version of "1.0.0" is a different object than one with an Agency of "A", an ID of "X", and a version of "1.1.0".
489 489  
490 -As of SDMX 3.0, the versioning rules are extended to allow for truly versioned artefacts through the implementation of the rules of the well-known practice called "Semantic Versioning" [[(>>url:http://semver.org/]][[http:~~/~~/semver.org>>url:http://semver.org/]][[)>>url:http://semver.org/]], in addition to the legacy non-restrictive versioning scheme. In addition, the "isFinal" property is removed from
454 +As of SDMX 3.0, the versioning rules are extended to allow for truly versioned artefacts through the implementation of the rules of the well-known practice called "Semantic Versioning" ([[http:~~/~~/semver.org>>https://http:semver.org]]), in addition to the legacy non-restrictive versioning scheme. In addition, the "isFinal" property is removed from
491 491  
492 -//MaintainableArtefact//. According to the legacy versioning, any artefact defined without a version is equivalent to following the legacy versioning, thus having version
456 +//MaintainableArtefact//. According to the legacy versioning, any artefact defined without a version is equivalent to following the legacy versioning, thus having version ‘1.0’.
493 493  
494 -‘1.0’.
495 -
496 496  === 4.3.1 Non-versioned artefacts ===
497 497  
498 498  Indeed, some use cases do not need or are incompatible with versioning for some or all their structural artefacts, such as the Agency, Data Providers, Metadata Providers and Data Consumer Schemes. These artefacts follow the legacy versioning, with a fixed version set to ‘1.0’.