Changes for page 4 General Notes for Implementers
Last modified by Artur on 2025/09/10 11:19
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -162,12 +162,11 @@ 162 162 A Gregorian time period is always represented by a Gregorian year, year-month, or day. These are all based on ISO 8601 dates. The representation in SDMX-ML messages and the period covered by each of the Gregorian time periods are as follows: 163 163 164 164 **Gregorian Year:** 165 + 165 165 Representation: xs:gYear (YYYY) 166 -Period: the start of January 1 to the end of December 31 167 -**Gregorian Year Month**: 167 +Period: the start of January 1 to the end of December 31 **Gregorian Year Month**: 168 168 Representation: xs:gYearMonth (YYYY-MM) 169 -Period: the start of the first day of the month to end of the last day of the month 170 -**Gregorian Day**: 169 +Period: the start of the first day of the month to end of the last day of the month **Gregorian Day**: 171 171 Representation: xs:date (YYYY-MM-DD) 172 172 Period: the start of the day (00:00:00) to the end of the day (23:59:59) 173 173 ... ... @@ -175,7 +175,7 @@ 175 175 176 176 This is used to unambiguously state that a date-time represents an observation at a single point in time. Therefore, if one wants to use SDMX for data which is measured at a distinct point in time rather than being reported over a period, the date-time representation can be used. 177 177 178 -Representation: xs:dateTime (YYYY-MM-DDThh:mm:ss) {{footnote}}The seconds canbereported fractionally{{/footnote}}177 +Representation: xs:dateTime (YYYY-MM-DDThh:mm:ss)[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[2~]^^>>path:#_ftn2]] 179 179 180 180 === 4.2.6 Standard Reporting Period === 181 181 ... ... @@ -244,7 +244,7 @@ 244 244 245 245 Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53) 246 246 247 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[3~]^^>>path:#_ftn3]](%%) The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.246 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[3~]^^>>path:#_ftn3]](%%) The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods. 248 248 249 249 **Reporting Day**: 250 250 ... ... @@ -276,7 +276,7 @@ 276 276 11. **If the [PERIOD_INDICATOR] is W:** 277 277 111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:** 278 278 279 -Add[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%) (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].278 +Add[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%) (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE]. 280 280 281 281 1. 282 282 11.