Last modified by Artur on 2025/09/10 11:19

From version 2.6
edited by Helena
on 2025/06/08 23:41
Change comment: There is no comment for this version
To version 2.5
edited by Helena
on 2025/06/08 23:40
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -175,7 +175,7 @@
175 175  
176 176  This is used to unambiguously state that a date-time represents an observation at a single point in time. Therefore, if one wants to use SDMX for data which is measured at a distinct point in time rather than being reported over a period, the date-time representation can be used.
177 177  
178 -Representation: xs:dateTime (YYYY-MM-DDThh:mm:ss){{footnote}}The seconds can be reported fractionally{{/footnote}}
178 +Representation: xs:dateTime (YYYY-MM-DDThh:mm:ss)[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[2~]^^>>path:#_ftn2]]
179 179  
180 180  === 4.2.6 Standard Reporting Period ===
181 181  
... ... @@ -244,7 +244,7 @@
244 244  
245 245  Representation: common:ReportingWeekType (YYYY-Www, e.g. 2000-W53)
246 246  
247 -Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[3~]^^>>path:#_ftn3]](%%) The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
247 +Notes: There are either 52 or 53 weeks in a reporting year. This is based on the ISO 8601 definition of a week (Monday - Saturday), where the first week of a reporting year is defined as the week with the first Thursday on or after the reporting year start day.[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[3~]^^>>path:#_ftn3]](%%) The reporting week is always represented as two digits, therefore 1-9 are 0 padded (e.g. 01). This allows the values to be sorted chronologically using textual sorting methods.
248 248  
249 249  **Reporting Day**:
250 250  
... ... @@ -276,7 +276,7 @@
276 276  11. **If the [PERIOD_INDICATOR] is W:**
277 277  111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:**
278 278  
279 -Add[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%) (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
279 +Add[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%) (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
280 280  
281 281  1.
282 282  11.