Last modified by Artur on 2025/09/10 11:19

From version 4.1
edited by Helena
on 2025/06/11 00:19
Change comment: There is no comment for this version
To version 2.9
edited by Helena
on 2025/06/08 23:45
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -237,33 +237,34 @@
237 237  Combine [REPORTING_YEAR] of the reporting period value (YYYY) with [REPORTING_YEAR_START_DAY] (MM-DD) to get a date (YYYY-MM-DD).
238 238  This is the [REPORTING_YEAR_START_DATE]
239 239  
240 -a) **If the [PERIOD_INDICATOR] is W:**
240 +1.
241 +11. **If the [PERIOD_INDICATOR] is W:**
242 +111. **If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:**
241 241  
242 -**~1. If [REPORTING_YEAR_START_DATE] is a Friday, Saturday, or Sunday:**
243 -Add[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%) (P3D, P2D, or P1D respectively) to the 
244 -[REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
244 +Add[[(% class="wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink wikiinternallink" %)^^~[4~]^^>>path:#_ftn4]](%%) (P3D, P2D, or P1D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
245 245  
246 -2. **If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
246 +1.
247 +11.
248 +111. **If [REPORTING_YEAR_START_DATE] is a Monday, Tuesday, Wednesday, or Thursday:**
247 247  
248 -Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the
249 -[REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
250 +Add^^4^^ (P0D, -P1D, -P2D, or -P3D respectively) to the [REPORTING_YEAR_START_DATE]. The result is the [REPORTING_YEAR_BASE].
250 250  
251 -**​​​​​​​b)** **Else:**
252 +1.
253 +11. **Else:**
252 252  
253 253  The [REPORTING_YEAR_START_DATE] is the [REPORTING_YEAR_BASE].
254 254  
255 -**2. Determine [PERIOD_DURATION]:**
256 -
257 -1. If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.
258 -1. If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.
259 -1. If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.
260 -1. If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.
261 -1. If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.
262 -1. If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.
263 -1. If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.
257 +1. **Determine [PERIOD_DURATION]:**
258 +11. If the [PERIOD_INDICATOR] is A, the [PERIOD_DURATION] is P1Y.
259 +11. If the [PERIOD_INDICATOR] is S, the [PERIOD_DURATION] is P6M.
260 +11. If the [PERIOD_INDICATOR] is T, the [PERIOD_DURATION] is P4M.
261 +11. If the [PERIOD_INDICATOR] is Q, the [PERIOD_DURATION] is P3M.
262 +11. If the [PERIOD_INDICATOR] is M, the [PERIOD_DURATION] is P1M.
263 +11. If the [PERIOD_INDICATOR] is W, the [PERIOD_DURATION] is P7D.
264 +11. If the [PERIOD_INDICATOR] is D, the [PERIOD_DURATION] is P1D.
264 264  1. **Determine [PERIOD_START]:**
265 265  
266 -Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add{{footnote}}The rules for adding durations to a date time are described in the W3C XML Schema specification. See http://www.w3.org/TR/xmlschema-2/#adding-durations-todateTimes for further details.{{/footnote}} this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START].
267 +Subtract one from the [PERIOD_VALUE] and multiply this by the [PERIOD_DURATION]. Add^^4^^ this to the [REPORTING_YEAR_BASE]. The result is the [PERIOD_START].
267 267  
268 268  1. **Determine the [PERIOD_END]:**
269 269  
... ... @@ -329,26 +329,25 @@
329 329  
330 330  In version 2.0 of SDMX there is a recommendation to use the time format attribute to gives additional information on the way time is represented in the message. Following an appraisal of its usefulness this is no longer required. However, it is still possible, if required , to include the time format attribute in SDMX-ML.
331 331  
332 -(% style="width:890.835px" %)
333 -|(% style="width:95px" %)**Code**|(% style="width:793px" %)**Format**
334 -|(% style="width:95px" %)OTP|(% style="width:793px" %)Observational Time Period: Superset of all SDMX time formats (Gregorian Time Period, Reporting Time Period, and Time Range)
335 -|(% style="width:95px" %)STP|(% style="width:793px" %)Standard Time Period: Superset of Gregorian and Reporting Time Periods
336 -|(% style="width:95px" %)GTP|(% style="width:793px" %)Superset of all Gregorian Time Periods and date-time
337 -|(% style="width:95px" %)RTP|(% style="width:793px" %)Superset of all Reporting Time Periods
338 -|(% style="width:95px" %)TR|(% style="width:793px" %)(((
333 +|(% style="width:95px" %)Code|(% style="width:1520px" %)Format
334 +|(% style="width:95px" %)OTP|(% style="width:1520px" %)Observational Time Period: Superset of all SDMX time formats (Gregorian Time Period, Reporting Time Period, and Time Range)
335 +|(% style="width:95px" %)STP|(% style="width:1520px" %)Standard Time Period: Superset of Gregorian and Reporting Time Periods
336 +|(% style="width:95px" %)GTP|(% style="width:1520px" %)Superset of all Gregorian Time Periods and date-time
337 +|(% style="width:95px" %)RTP|(% style="width:1520px" %)Superset of all Reporting Time Periods
338 +|(% style="width:95px" %)TR|(% style="width:1520px" %)(((
339 339  Time Range: Start time and duration (YYYY-MM-DD(Thh:mm:ss)?/<duration>)
340 340  )))
341 -|(% style="width:95px" %)GY|(% style="width:793px" %)Gregorian Year (YYYY)
342 -|(% style="width:95px" %)GTM|(% style="width:793px" %)Gregorian Year Month (YYYY-MM)
343 -|(% style="width:95px" %)GD|(% style="width:793px" %)Gregorian Day (YYYY-MM-DD)
344 -|(% style="width:95px" %)DT|(% style="width:793px" %)Distinct Point: date-time (YYYY-MM-DDThh:mm:ss)
345 -|(% style="width:95px" %)RY|(% style="width:793px" %)Reporting Year (YYYY-A1)
346 -|(% style="width:95px" %)RS|(% style="width:793px" %)Reporting Semester (YYYY-Ss)
347 -|(% style="width:95px" %)RT|(% style="width:793px" %)Reporting Trimester (YYYY-Tt)
348 -|(% style="width:95px" %)RQ|(% style="width:793px" %)Reporting Quarter (YYYY-Qq)
349 -|(% style="width:95px" %)RM|(% style="width:793px" %)Reporting Month (YYYY-Mmm)
350 -|(% style="width:95px" %)RW|(% style="width:793px" %)Reporting Week (YYYY-Www)
351 -|(% style="width:95px" %)RD|(% style="width:793px" %)Reporting Day (YYYY-Dddd)
341 +|(% style="width:95px" %)GY|(% style="width:1520px" %)Gregorian Year (YYYY)
342 +|(% style="width:95px" %)GTM|(% style="width:1520px" %)Gregorian Year Month (YYYY-MM)
343 +|(% style="width:95px" %)GD|(% style="width:1520px" %)Gregorian Day (YYYY-MM-DD)
344 +|(% style="width:95px" %)DT|(% style="width:1520px" %)Distinct Point: date-time (YYYY-MM-DDThh:mm:ss)
345 +|(% style="width:95px" %)RY|(% style="width:1520px" %)Reporting Year (YYYY-A1)
346 +|(% style="width:95px" %)RS|(% style="width:1520px" %)Reporting Semester (YYYY-Ss)
347 +|(% style="width:95px" %)RT|(% style="width:1520px" %)Reporting Trimester (YYYY-Tt)
348 +|(% style="width:95px" %)RQ|(% style="width:1520px" %)Reporting Quarter (YYYY-Qq)
349 +|(% style="width:95px" %)RM|(% style="width:1520px" %)Reporting Month (YYYY-Mmm)
350 +|(% style="width:95px" %)RW|(% style="width:1520px" %)Reporting Week (YYYY-Www)
351 +|(% style="width:95px" %)RD|(% style="width:1520px" %)Reporting Day (YYYY-Dddd)
352 352  
353 353  (% class="wikigeneratedid" id="HTable1:SDMX-MLTimeFormatCodes" %)
354 354  **Table 1: SDMX-ML Time Format Codes**
... ... @@ -398,13 +398,12 @@
398 398  
399 399  Fundamental to processing a time value parameter in a query message is understanding that all time periods should be handled as a distinct range of time. Since the time parameter in the query is paired with an operator, this also effectively represents a distinct range of time. Therefore, a system processing the query must simply match the data where the time period for requested parameter is encompassed by the time period resulting from value of the query parameter. The following table details how the operators should be interpreted for any time period provided as a parameter.
400 400  
401 -(% style="width:770.835px" %)
402 -|(% style="width:220px" %)**Operator**|(% style="width:548px" %)**Rule**
403 -|(% style="width:220px" %)Greater Than|(% style="width:548px" %)Any data after the last moment of the period
404 -|(% style="width:220px" %)Less Than|(% style="width:548px" %)Any data before the first moment of the period
405 -|(% style="width:220px" %)Greater Than or Equal To|(% style="width:548px" %)Any data on or after the first moment of the period
406 -|(% style="width:220px" %)Less Than or Equal To|(% style="width:548px" %)Any data on or before the last moment of the period
407 -|(% style="width:220px" %)Equal To|(% style="width:548px" %)Any data which falls on or after the first moment of the period and before or on the last moment of the period
401 +|**Operator**|**Rule**
402 +|Greater Than|Any data after the last moment of the period
403 +|Less Than|Any data before the first moment of the period
404 +|Greater Than or Equal To|Any data on or after the first moment of the period
405 +|Less Than or Equal To|Any data on or before the last moment of the period
406 +|Equal To|Any data which falls on or after the first moment of the period and before or on the last moment of the period
408 408  
409 409  Reporting Time Periods as query parameters are handled like this: any data within the bounds of the reporting period for the year is matched, regardless of the actual start day of the reporting year. In addition, data reported against a normal calendar period is matched if it falls within the bounds of the time parameter based on a reporting year start day of January 1. When determining whether another reporting period falls within the bounds of a report period query parameter, one will have to take into account the actual time period to compare weeks and days to higher order report periods. This will be demonstrated in the examples to follow.
410 410  
... ... @@ -411,8 +411,11 @@
411 411  **Examples:**
412 412  
413 413  **Gregorian Period**
413 +
414 414  Query Parameter: Greater than 2010
415 +
415 415  Literal Interpretation: Any data where the start period occurs after 2010-1231T23:59:59.
417 +
416 416  Example Matches:
417 417  
418 418  * 2011 or later
... ... @@ -428,7 +428,9 @@
428 428  * 2010-D185 or later (reporting year start day ~-~-07-01 or later)
429 429  
430 430  **Reporting Period**
433 +
431 431  Query Parameter: Greater than or equal to 2010-Q3
435 +
432 432  Literal Interpretation: Any data with a reporting period where the start period is on or after the start period of 2010-Q3 for the same reporting year start day, or and data where the start period is on or after 2010-07-01. Example Matches:
433 433  
434 434  * 2011 or later
... ... @@ -440,9 +440,9 @@
440 440  * 2010-T3 (any reporting year start day)
441 441  * 2010-Q3 or later (any reporting year start day)
442 442  * 2010-M07 or later (any reporting year start day)
443 -* 2010-W27 or later (reporting year start day ~-~-01-01){{footnote}}2010-Q3 (with a reporting year start day of --01-01) starts on 2010-07-01. This is day 4 of week 26, therefore the first week matched is week 27.{{/footnote}}
447 +* 2010-W27 or later (reporting year start day ~-~-01-01)^^5^^
444 444  * 2010-D182 or later (reporting year start day ~-~-01-01)
445 -* 2010-W28 or later (reporting year start day ~-~-07-01){{footnote}}2010-Q3 (with a reporting year start day of --07-01) starts on 2011-01-01. This is day 6 of week 27, therefore the first week matched is week 28.{{/footnote}}
449 +* 2010-W28 or later (reporting year start day ~-~-07-01)^^6^^
446 446  * 2010-D185 or later (reporting year start day ~-~-07-01)
447 447  
448 448  == 4.3 Versioning ==
... ... @@ -449,8 +449,12 @@
449 449  
450 450  Versioning operates at the level of versionable and maintainable objects in the SDMX information model. Within the SDMX Structure and MetadataSet messages, there is a well-defined pattern for artefact versioning and referencing. The artefact identifiers are qualified by their version numbers – that is, an object with an Agency of "A", and ID of "X" and a version of "1.0.0" is a different object than one with an Agency of "A", an ID of "X", and a version of "1.1.0".
451 451  
452 -As of SDMX 3.0, the versioning rules are extended to allow for truly versioned artefacts through the implementation of the rules of the well-known practice called "Semantic Versioning" ([[http:~~/~~/semver.org>>https://http:semver.org]]), in addition to the legacy non-restrictive versioning scheme. In addition, the "isFinal" property is removed from //MaintainableArtefact//. According to the legacy versioning, any artefact defined without a version is equivalent to following the legacy versioning, thus having version ‘1.0’.
456 +As of SDMX 3.0, the versioning rules are extended to allow for truly versioned artefacts through the implementation of the rules of the well-known practice called "Semantic Versioning" [[(>>url:http://semver.org/]][[http:~~/~~/semver.org>>url:http://semver.org/]][[)>>url:http://semver.org/]], in addition to the legacy non-restrictive versioning scheme. In addition, the "isFinal" property is removed from
453 453  
458 +//MaintainableArtefact//. According to the legacy versioning, any artefact defined without a version is equivalent to following the legacy versioning, thus having version
459 +
460 +‘1.0’.
461 +
454 454  === 4.3.1 Non-versioned artefacts ===
455 455  
456 456  Indeed, some use cases do not need or are incompatible with versioning for some or all their structural artefacts, such as the Agency, Data Providers, Metadata Providers and Data Consumer Schemes. These artefacts follow the legacy versioning, with a fixed version set to ‘1.0’.
... ... @@ -526,4 +526,13 @@
526 526  
527 527  ----
528 528  
537 +[[~[1~]>>path:#_ftnref1]] Regular expressions, as specified in [[W3C XML Schema Definition Language (XSD)>>url:https://www.w3.org/TR/xmlschema11-2/]][[ >>url:https://www.w3.org/TR/xmlschema11-2/]][[1.1 Part 2: Datatypes>>url:https://www.w3.org/TR/xmlschema11-2/]][[.>>url:https://www.w3.org/TR/xmlschema11-2/]]
538 +
539 +[[~[2~]>>path:#_ftnref2]] The seconds can be reported fractionally
540 +
541 +[[~[3~]>>path:#_ftnref3]] ISO 8601 defines alternative definitions for the first week, all of which produce equivalent results. Any of these definitions could be substituted so long as they are in relation to the reporting year start day.
542 +
543 +[[~[4~]>>path:#_ftnref4]] The rules for adding durations to a date time are described in the W3C XML Schema specification. See [[http:~~/~~/www.w3.org/TR/xmlschema>>url:http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes]][[->>url:http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes]][[2/#adding>>url:http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes]][[->>url:http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes]][[durations>>url:http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes]][[->>url:http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes]][[to>>url:http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes]][[dateTimes>>url:http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes]][[ >>url:http://www.w3.org/TR/xmlschema-2/#adding-durations-to-dateTimes]]for further details.
544 +
545 +
529 529  {{putFootnotes/}}
SUZ.Methodology.Code.MethodologyClass[0]
index
... ... @@ -1,1 +1,0 @@
1 -4